Twelve terms from the site plans and the utility filings.
- Gigawatt (GW)
- A billion watts. The output of a large nuclear reactor, the draw of three-quarters of a million homes, and the new unit for an AI campus.
- IT load
- The power the computing equipment itself draws: GPUs, CPUs, switches, storage. Everything else on the site exists to deliver it and remove it as heat.
- PUE
- Power usage effectiveness: total site power divided by IT power. 1.0 would be perfect; the industry averages about 1.55; the best sites run 1.1.
- WUE
- Water usage effectiveness: litres of water used per kilowatt-hour of IT energy. The industry average is around 1.8; dry-cooled sites approach zero.
- Substation
- Where the transmission voltage (138–345 kV) is stepped down for the site, usually to 34.5 kV. Its transformers are the longest-lead item on the campus.
- UPS
- Uninterruptible power supply: batteries (and their converters) that carry the load for seconds to minutes while generators start.
- Busway / busbar
- Rigid copper or aluminium conductors that carry power along a row (busway, 480 V) and down a rack (busbar, 54 V DC, soon 800 V DC).
- Direct-to-chip (DTC)
- Liquid cooling with a cold plate bolted to each hot chip. Captures 70–80 % of a rack's heat as warm water; the rest still goes to air.
- Cold plate
- A copper block with microchannels inside, through which coolant flows across the chip's surface. One per GPU, CPU and switch in an NVL72.
- CDU
- Coolant distribution unit: pumps, filters and a plate heat exchanger that join the closed rack loop to the facility water without mixing them.
- Cooling tower / dry cooler
- The two ways to shed heat outdoors: evaporate water (cheap, uses water) or blow air over finned coils (uses no water, more fan power).
- Behind the meter
- Generating power on site rather than taking it from the grid: gas turbines, fuel cells, batteries. The fast route when the grid connection is years away.